2026

Rates and Fees

New Buildings, Additions, and Mezzanines

Finished $1.91/ft2
Shell $1.63/ft2
Interior Alterations, Renovations and Tenancy Work $0.93/ft2

Finished $2.19/ft2
Shell $1.87/ft2
Interior Alterations, Renovations and Tenancy Work $0.94/ft2

Detached, Semi detached, Row Houses, Additions, Secondary Suites $1.48/ft2
Multi-Unit Buildings, Motels, Hotels $1.48/ft2
Interior Alterations, Renovations $0.94/ft2
Decks, Porches, Accessory Buildings, Carports $0.94/ft2

Finished $2.12/ft2
Shell $1.80/ft2
Interior Alterations, Renovations and Tenancy Work $1.12/ft2

Finished $2.12/ft2
Shell $1.80/ft2
Interior Alterations, Renovations and Tenancy Work $1.12/ft2

Finished $1.59/ft2
Shell $1.34/ft2
Interior Alterations, Renovations and Tenancy Work $1.11/ft2
Underground parking garages, Open air parking garages $1.59/ft2

High Hazard (G1) $1.14/ft2
Other (G2) $1.01/ft2
Greenhouse (G3) $0.38/ft2
No Occupancy (G4) $0.67/ft2

Mechanical & Servicing

New HVAC system $232.00
Commercial Cooking Exhaust and Ventilation System $549.00

Emergency Power $232.00
Emergency Lighting $232.00

Backflow Preventer / Backwater Valve, Interceptors (Grease or Oil) $232.00
Building Drain, Building Sewer, Water Service, Site Servicing (Below Grade)  $232.00
Plumbing – Internal (up to 20 fixtures) plus $9.25 for each additional fixture $232.00

Fire Alarm System (New or Replacement) (per 1,000m2 per storey) (10,764ft2) $665.00
Electromagnetic Locks (up to 5 locks) ($50.00 per additional lock over 5) $665.00
Fire Sprinkler System (New or Replacement) (per 1,000m2 per storey) (10,764ft2) $665.00
Spray Booth, Dust Collector System $549.00

New System $1,300.00
Holding Tank $1,300.00
Replacement Tank Only $700.00
Leaching Bed Repair $700.00
Other Minor Repairs $300.00

Other

Group C: Residential $456.00
Group C: Residential (Accessory Building) $232.00
All Other Buildings OBC Division C 1.2.2.3.(1) $456.00

Lot Grading Review $232.00
Public Pool / Spa $698.00 - 587.00
Retaining Wall $456.00 - 587.00
Solar Collector - Residential $232.00 - 587.00
Solar Collector - Non-Residential $546.00 - 587.00
Portable Classroom $334.00
Outdoor Patio $334.00
Move or Relocate a Building $652.00
Fireplace, Wood Burning Stove $274.00
Fire Code Retrofit / Repair $698.00
Temporary Tents and Stages up to 225m2 (2,242ft2) $274.00
Temporary Tents and Stages greater than 225m2  (2,242ft2) $420.00
Private Outdoor Pool Enclosure Permit $300.00
Signs designated in By-Law 1997-45 (other than Portable Signs) $300.00
Portable Signs designated in By-Law 1997-45 (each 30 day period) $114.00
Sign Variance Application as outlined in By-Law 1997-45 $665.00
Sign Regulated by the Ontario Building Code $456.00

 

Limiting Distance Agreement  $527.00 + Cost to register
Special Servicing (Plumbing crossing multiple properties) $527.00 + Cost to register

All Buildings / systems under Part 9 of the Building Code $942.00
All other Buildings / systems $1,255.00

AGCO Agency Letter - Active Building Permit $157.00
AGCO Agency Letter - No Active Building Permit $188.00
Building Compliance Letter / Property Report (see other Schedules for additional fees) $282.00

Detached, Semi-detached, Row Houses, Secondary Suite $131.00
Multi-Unit Residential Buildings (base building) $292.00
Multi-Unit Residential Buildings (additional fee per suite) $65.00
New Buildings other than Residential (per suite in multi-unit buildings) $292.00

New House $377.00
All other Buildings 20% of full permit fee 20%
An Amendment to Conditional Building Permit Agreement $126.00

Re-Inspection Fee - Active Building Permit $101.00
Special Inspection - No Active Building Permit $189.00

Major Revision up to 3 hours review time $314.00
Major Revision for each hour after 3 hours review $157.00
Minor Revision $63.00

Zoning Verification (Pools, Signs, Decks, Accessory Buildings) $76.00
Zoning Verification (Detached, Semi-detached, Row Houses, Additions, Secondary Suites $101.00

Order to Comply $350.00
Stop Work Order $500.00
Order to Remedy Unsafe Building $750.00
Order Respecting Occupancy $1,500.00
Subsequent Visit pursuant to Order $150.00/hour

In addition to the regular permit fee payable for the entire project. A required premium fee equal 
to the greater of 50% of the regular permit fee or the min/max of: 

New detached / semi-detached residential units Min. $450 - Max. $10,000
Residential - Other than new detached or semi-detached Min. $250 - Max. $10,000
Commercial / Industrial / Institutional projects Min. $750 - Max. $20,000

Other Associated Fees

Various types of construction projects may be subject to additional fees payable at time of permit issuance. These fees are separate from building permit fees, and are regulated by varying governing bodies. If you have any clarifying questions related to the fees mentioned below please contact the individual departments listed.

These fees include but are not limited to:

The Niagara Region and the Town of Grimsby require developers to contribute to the capital costs of municipal services (such as roads, water, and sewers) needed to support new developments, based on the idea that "growth should finance growth."

Niagara Region Finance -  905-980-6000 ext. 3528

Town of Grimsby Finance - 905-945-9634 ext. 2169

Parkland dedication fees, or cash-in-lieu of parkland, are charges imposed by municipalities on developers as part of the development or redevelopment process, intended to support the purchase and enhancement of parkland and public recreational spaces.

Town of Grimsby Planning -  905-945-9634 ext. 2128

Community Benefits Charges (CBCs) are a recent financial mechanism introduced under the Ontario Planning Act, enabling municipalities to impose fees on high-density residential developments (5+ storeys, 10+ units) to cover growth-related capital expenses, provided these costs are not already addressed by development charges or parkland requirements.

Town of Grimsby Planning -  905-945-9634 ext. 2128

Development Engineering is a branch within the Planning Division, tasked with conducting detailed technical engineering reviews of development projects. From start to finish, the Development Engineering Team collaborates with the Planning Services team and Public Works team to ensure that developments align with plans, policies, standards, and regulations.

Development Engineering Purview:

  • Grading securities
  • Public Works inspections
  • Curb cuts
  • Water on-off service
  • Site alteration 
  • Tree hoarding 
  • Road occupancy permit
  • Damage deposits
  • Pool bond release inspection 
  • Road cuts
  • Servicing connection 
  • Culvert permit 
  • Silt fencing
  • Outdoor patio permit
  • Lot grading reviews
  • Water meter cost and process
  • Water service pipe installs
  • Construction water usage 
  • Road entrance permit 
  • Temporary construction entrance
  • Storm Water Management

Town of Grimsby Public Works  905-945-9634 ext. 2014

  • The minimum fee for a permit shall be $232.00, unless otherwise stated in this Bylaw.
  • Fees for a required permit are set out in this Schedule and are due and payable upon 
    submission of an application for a permit. Fees may be payable at permit issuance at the 
    discretion of the Chief Building Official.
  • For new buildings, additions and alterations, the fees for occupancy, plumbing,  below 
    grade piping, sprinkler and fire alarm systems, finished basement areas in a house and any 
    balconies, decks, patio and porch structures are in addition to the applicable Service Index permit 
    fee.
  • For the purpose of this Schedule the occupancy classification and floor area shall be determined on the following basis:
    • The occupancy classification shall be established in accordance with the occupancy 
      definitions of the Ontario Building Code. For multiple occupancy floor areas, the permit fees for 
      each of the applicable occupancy categories may be used, except where an occupancy category 
      is less than 10% of the floor area.
    • The floor area calculation is the sum of the areas of all floors including finished basement 
      areas, balconies, lofts, mezzanines, habitable attic spaces, mechanical penthouses and shall be 
      measured to the outer face of the exterior walls and to the centre line of party walls, firewalls or 
      demising walls.
    • For interior finishes, alterations or renovations, the area of proposed work is the actual space 
      receiving the work, e.g. tenant suite and measurements are taken to the inner face of walls.
    • Except for interconnected floor spaces, no deductions shall be made for openings within the 
      floor area, i.e. stairs, elevators, ducts.
    • Unfinished basements for a house are not included in calculating the floor area. A future 
      basement finish is subject to a building permit and fees in accordance with this Schedule.
    • A garage serving a house to which it is attached or built-in shall not be included in the floor 
      area calculations.
    • Decks and wood burning fireplaces shall be charged the permit fee in accordance with this 
      Schedule in addition to the applicable floor area calculations.
    • Horizontal projection of sloping and stepped floors shall be used in lieu of actual surface area.
    • Where interior alterations and renovations require relocation of not more than 9 sprinkler 
      heads, standpipe components or fire alarm components, no additional charge is applicable.
    • Where demolition of partitions or alterations to existing ceilings are part of an alteration or 
      renovation permit, no additional charge is applicable.
  • A temporary building is considered to be a building that will be erected for not more than 
    three years.
  • Permit fees for temporary tents and stages shall be charged for each property and for 
    each event on a single property.
  • Permit fees for multiple decks, tents or stages constructed simultaneously on a single 
    property shall be 50% of the applicable permit fee listed in this Schedule.
  • For classes of permits not described in this Schedule, a reasonable permit fee shall be 
    determined by the Chief Building Official.

Permit fees shall be calculated using the following formula unless otherwise specified in 
this Schedule:
Permit Fee = SI x A
Where: Sl = the fee multiplier based on the service index for the type/classification of the work 
proposed; and =  total floor area of the work involved

  •  Fees that may be refunded shall be a percentage of the permit fees payable under this 
    By-law, calculated as follows:
    • 75 percent if administrative functions only have been performed.
    • 70 percent if administrative and zoning functions only have been performed.
    • 50 percent if administrative, zoning and plans examination functions have been performed.
    • 45 percent if the permit has been issued and no field inspections have been performed 
      subsequent to permit issuance.
    • 5 percent shall additionally be deducted for each field inspection that has been performed 
      after the permit has been issued.
  • Where the Chief Building Official deems it appropriate, a refund of other than specified in 
    section 3.1. may be granted.
  • No refunds shall be payable where the calculated refund is less than the minimum fee.
  • The following fees shall not be refundable:
    • application for transfer of application or permit,
    • request for conditional permit,
    • revision to permit,
    • authorization of alternative solution,
    • request for deferral.
  • The refund shall be returned to the person named on the fee receipt, unless such person 
    advises the Chief Building Official, in writing and prior to the release of the refund, of a change in 
    name, in which case the refund shall be returned to the person then authorized to receive it.
  • Refund provisions are not applicable where the permit has been signed off and the 
    occupancy inspection completed.
  • No refund of building permit fees on any application or permit after 2 years from the date 
    the application was submitted, deemed to be abandoned, refused to be issued or request to be 
    withdrawn

  • Change of Ownership and Transfer of Permit
    To transfer a permit from a permit holder to another, a minimum fee of $94.00 shall be payable in 
    addition to other applicable fees.
  • Change of Use (No Construction)
    For the change of use of a major occupancy where no construction is proposed or required, a 
    minimum fee of $232.00 shall be payable.
  • Compliance and Agency Letters
    • For written requests on information for status of active building permits and Building Code 
      Act orders, the fee as set out in this Schedule shall be paid.
    • For written requests in support of provincial license applications such as an AGCO liquor 
      licence, the fee as set out in this Schedule shall be paid.
  •  Conditional Building Permits
    • For conditional building permits, the fee shall be the normal building permit fee for the 
      proposed construction plus the fee as set out in this Schedule.
    • The minimum fee for a conditional permit application shall be $232.00.
    • The maximum fee for each permit application shall be $15,000.00. (The proponent is 
      responsible for the registration of the conditional permit agreement on title to the lands.)
  • Constructing without a Permit
    Where work or construction has commenced prior to the issuance of a building permit, an 
    administrative surcharge for the unlawful work of 100% of the required permit fee shall be paid. 
    The minimum surcharge fee shall be $195.00. The maximum surcharge fee shall be $5,000.00.
  • Dormant Permit Files and Deferred Inspections
    Where a permit has been dormant for a period of more than 12 months, the fee as set out in this 
    Schedule shall be payable in addition to other applicable fees.
  • Re-Inspection Fees
    Where an Inspector determines that work for the stage of construction that has been requested to 
    be inspected is not substantially complete, is not ready for an inspection or where previous 
    infractions have not been corrected, the fee as set out in this Schedule shall be payable prior to 
    subsequent inspections related to that stage of construction being scheduled.
  • Revision to a Permit  -- Reviewed Drawings
    • Where a supplementary submission or a revised submission related to a building permit 
      application is required or unauthorized modifications from the reviewed permit drawings occur on 
      site, the fee as set out in this Schedule  shall be payable.
    • Where an increase in floor area has been constructed, additional building permit fees at the 
      applicable service index and administrative fees noted above may be payable.
  • Photocopies
    Copies of drawings, surveys, etc. only following a Routine Disclosure approval. $10.00 per page 
    up to 11"x17" (min $30.00), $30.00 per page over 11"x17"

If you require further assistance or have any questions, please feel free to contact us. You can email building@grimsby.ca, or call 905.309.2022 to speak with a Building Technician, who will be happy to offer guidance. 

Contact Us

Town of Grimsby
160 Livingston Avenue
Grimsby ON, L3M 0J5
Phone: 905-945-9634
Fax: 905-945-5010

Sign up to stay up to date with news from the Town of Grimsby

Stay up to date on the Town's activities, events, programs and operations by subscribing to our News Alerts.